Operation CHARM: Car repair manuals for everyone.

P2716





AB60F AUTOMATIC TRANSMISSION / TRANSAXLE: AUTOMATIC TRANSMISSION SYSTEM: P2716: Pressure Control Solenoid "D" Electrical (Shift Solenoid Valve SLT)
P2716 - Pressure Control Solenoid "D" Electrical (Shift Solenoid Valve SLT)

DESCRIPTION

Refer to DTC P0894 P0894.





Reference: Inspect using an oscilloscope.

Check the waveform of the ECM connector.

Standard:









MONITOR DESCRIPTION

When an open or short in the shift solenoid valve SLT circuit is detected, the ECM interprets this as a fault. The ECM will turn on the MIL and store the DTC.

MONITOR STRATEGY





TYPICAL ENABLING CONDITIONS





TYPICAL MALFUNCTION THRESHOLDS





COMPONENT OPERATING RANGE





WIRING DIAGRAM





INSPECTION PROCEDURE

NOTICE:
Perform the universal trip to clear permanent DTCs DTC Check / Clear.

PROCEDURE

1. INSPECT NO. 1 TRANSMISSION WIRE (SHIFT SOLENOID VALVE SLT)

(a) Disconnect the C39 No. 1 transmission wire connector.





(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





NG -- INSPECT SHIFT SOLENOID VALVE SLT
OK -- Continue to next step.

2. CHECK HARNESS AND CONNECTOR (NO. 1 TRANSMISSION WIRE - ECM)





(a) Disconnect the C53 ECM connector.

(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR

OK -- REPLACE ECM Removal

3. INSPECT SHIFT SOLENOID VALVE SLT

(a) Remove shift solenoid valve SLT.





(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





(c) Apply battery voltage (12 V) to the shift solenoid valve and check that the valve moves and makes an operating noise.

OK:





NG -- REPLACE SHIFT SOLENOID VALVE SLT

OK -- REPAIR OR REPLACE NO. 1 TRANSMISSION WIRE Removal