Operation CHARM: Car repair manuals for everyone.

Installation





1AR-FE ENGINE MECHANICAL: DRIVE BELT: INSTALLATION

1. INSTALL V-RIBBED BELT

(a) Set the V-ribbed belt onto each part as shown in the illustration except the water pump pulley.





Text in Illustration





(b) Loosen the V-ribbed belt by turning the belt tensioner clockwise.

(c) Set the V-ribbed belt onto the water pump pulley.

NOTICE:
Make sure that the belt is attached to each pulley. In particular, make sure that the belt is securely fitted into the grooves of the crankshaft pulley.

2. INSTALL FRONT FENDER APRON SEAL RH Installation

3. INSTALL FRONT FENDER LINER RH

4. INSTALL NO. 1 ENGINE UNDER COVER

5. INSTALL FRONT WHEEL RH

Torque : 103 Nm (1050 kgf-cm, 76 ft-lbf)